Honeywell IAQPoint2 Guide De Démarrage Rapide page 290

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Duct Mounting
Special Duct Mount Installation
This option works best for airflows between 500–4000 ft./min.
The E
Point must be duct mounted using the custom box provided with
3
the duct mount version. All of the components housed within the box are
factory assembled.
1
Housing cover
1. Select the location for the unit.
2. Measure and mark the holes for intake and exhaust tubes.
3. Drill the holes for the sampling tubes (ensure holes are large
enough for the plug).
4. Affix intake and exhaust tubes to the mounting box.
5. Insert the tubes into the holes of the ducting.
Ensure to orient the air holes on the air intake tube to face the
airflow.
6. Screw the mounting box onto the duct.
7. Remove the desired knock out (depending on where cables will
enter box) and affix appropriate conduit.
8. Run wiring through conduit and duct mount box to unit and
connect wires according to Wiring.
9. Screw cover onto the E
mounting box.
E
Point Network Gas Monitor User Manual
3
3
2
Air flow
Ductmount housing
Figure 2. Duct Mounting
Point and replace the cover on the
3
4
Air intake tube
Air exhaust tube
Installation
5

Publicité

Chapitres

Table des Matières
loading

Table des Matières