Start-Up Procedure - Honeywell IAQPoint2 Guide De Démarrage Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The E
Point gas detection system is factory configured to conform
3
to specific standards. It is designed to be operational after physical
installation and warm-up procedures.

Start-Up Procedure

Before applying power, check all wiring for continuity, shorts, grounds,
etc. After power-up, ensure the LEDs below are operational as follows:
LED
Description
I/O
Power
1
Built-in sensor
2
Remote Sensor
E
Point Standalone Gas Monitor User Manual
3
Operation
LCD Screen
Navigation/Programming Buttons
Figure 7. E
Display Modes
Always on = Normal operation
Always off = microcontroller fault or no power
Blinking (twice per second) = self-test
Always on = Alarm A triggered
Slow blink = Alarm B/C triggered (1 blink/second)
Fast blink = Fault (4 blinks per second)
Always off = normal operation
Always on = Alarm A triggered
Slow blink = Alarm B/C triggered (1 blink/second)
Fast blink = Fault (4 blinks per second)
Always off = normal operation
LED Indicators
Point LCD
3
Operation
13

Publicité

Chapitres

Table des Matières
loading

Table des Matières