Operation levels
The parameterisation of the switchgear is divided
into the EASY and EXPERT menu areas.
For rapid commissioning using the factory presets,
it is sufficient to set the setpoint 1 in the EASY
area.
The EXPERT area is provided for changing other
parameters and for reading out data from the
device.
Menu level 7.0.0.0 is reserved for Wilo customer
service.

7 Installation and electrical connection

Installation and electrical connection must be
carried out in accordance with local regulations
and only by qualified personnel!
WARNING! Risk of injury!
Existing accident prevention regulations must
be adhered to.
WARNING! Danger of electric shock!
Danger due to electrical current must be elimi -
nated.
Local directives or general directives [e.g. IEC,
VDE etc.] and instructions from local energy
supply companies must be adhered to.

7.1 Installation

• Installation on base frame, FM (frame mounted):
In compact pressure-boosting systems, the
switchgear (depending on the system series)
can be mounted on the base frame of the compact
unit using 5 M10 screws.
• Floor model, BM (base mounted): The floor model
is set up free-standing on a level surface (with
sufficient bearing capacity). In the standard ver -
sion, there is an up-right panel support with a
height of 100 mm for the cable inlet. Other sup -
ports are available on request.
• Installation on a (vertical) mounting bracket,
WM (wall mounted): In compact pressure-boost -
ing systems, the switchgear (depending on the
system series) can be mounted on a mounting
bracket using 4 M8 screws.
Installation and operating instructions Wilo-Control SC-Booster (SC, SC-FC, SCe)

7.2 Electrical connection

WARNING! Danger of electric shock
Electrical connection must be carried out by an
electrician authorised by the local energy supply
company and in accordance with the applicable
local regulations [e.g. VDE regulations].
NOTICE:
All cables to be connected must be inserted
through threaded cable glands (FM and WM
installation type) or cable inlet plates (BM installa -
tion type) into the switchgear and secured so that
they are not under tension.

7.2.1 Connecting cable shields

Connecting cable shields to the EMC threaded
cable glands
If the respective connection (see 7.2.3 and 7.2.4)
requires the use of EMC threaded cable glands, the
cable shield should be connected according to the
following steps.
(1)
(2)
(3)
English
or
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Control sc-fc-boosterControl sce-booster

Table des Matières