Installing The Lock; Preparation For Mounting; Electrical Connections - Assa Abloy OneSystem 519N Notice De Montage

Masquer les pouces Voir aussi pour OneSystem 519N:
Table des Matières

Publicité

A
!
Prepare
and clean
lock pocket
Connecting cables
Installation
At tention!
Property damage due to missing profile cylinder in locked door: The motorised multi-point lock 519N
locks a closed door automatically and can then only be unlocked again via the profile cylinder. If a locking
cylinder is not installed, the door can only be opened by force. A construction locking cylinder must be
installed before the motorised multi-point lock 519N is installed.
Property damage from construction key: The use of a so-called construction key can destroy the lock.
Then the function is no longer guaranteed. Only use a suitable locking cylinder for operation of the lock.

Installing the lock

Warning!
Danger to life due to electric shock: Improper wiring is life-threatening and can ruin the motorised multi-
point lock 519N. The connection of the power supply may only be carried out by a trained, qualified person.
Risk of injury and life-threatening danger due to dangerous installation work. The machines and tasks
required for complete installation entail a considerable risk of injury. The cutting and preparations in
wood and metal may only be carried out by skilled, qualified personnel who are trained in the necessary
safety measures for the avoidance of severe injury, particularly when handling milling machines, saws, and
drilling machines.
Unsuitable doors reduce personal safety and intrusion protection: Only approved and technically flaw-
less doors are suitable for installation of the motorised multi-point lock 519N. Prior to the installation of the
motorised multi-point lock 519N, the door must be checked to ensure that it is attached properly and is not
warped. The door must be approved for use of the motorised multi-point lock 519N.

Preparation for mounting

1
Create the lock pocket at a suitable mounting position in the door leaf. Factor in an additional 30 mm
for the cable loop for the depth.
2
Finish the holes for the fixing screws (Fig. 20, page 182).
3
Drill the holes for the lock fittings (only with lock removed).
4
Clean the lock pocket and all holes by blowing them out or vacuuming.

Electrical connections

1
Prepare the wiring for the motorised multi-point lock 519N
("Electrical connection", page 62).
2
Connect the cables for the power supply and control unit.
EN
55

Publicité

Table des Matières
loading

Table des Matières