Selecting The Valve Supply - Aventics SERCOS III Mode D'emploi

Masquer les pouces Voir aussi pour SERCOS III:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 91
S2.4
S2.1
* Switch position
AVENTICS | SERCOS III | R412012610–BDL–001–AB
7.1.3

Selecting the valve supply

The valve power supply can be selected block-wise with the S2
sliding switch (under fitting B). It is possible to switch between
the U
and U
voltages from the external supply.
Q1
Q2
On delivery, all switches are set to position 1.
Voltage at switches
Switches can be damaged if voltage is applied during
operation.
O
Always operate switches in a voltage-free state!
O
Select the switch position for S2 according to the following
table.
Commissioning and Operation
NOTICE
71

Publicité

Table des Matières
loading

Table des Matières