SECTIoN 3
WarNINg
3.8
Secondary output Connections for Mechanized Cutting
CNC Control Cable
(back connection)
WarNINg
Installation, Operation, and Maintenance Manual for the
ClaMP ThE WorK CaBlE To ThE WorK PIECE. BE SurE ThE WorK
PIECE IS CoNNECTED To aN aPProVED EarTh grouND WITh a
ProPErlY SIZED grouND CaBlE.
GANTRY SHAPE CUTTING MACHINE
Torch Cable
figure 3-6. ESP-101 Interconnection Diagram
BEforE MaKINg aNY CoNNECTIoNS To ThE PoWEr SourCE ouT-
PuT TErMINalS, MaKE SurE ThaT all PrIMarY INPuT PoWEr To
ThE PoWEr SourCE IS DE ENErgIZED (off) aT ThE MaIN DISCoN-
NECT SWITCh.
SHADOW
PT-37
24
INSTallaTIoN
SAFETY GROUND
411 S. Ebenezer Road
Florence, SC 29501-0545