15 Commissioning
The MPS
®
Station is connected to the corresponding supply unit yet de-energized.
15.1 Teaching in the locations of the high-bay racking system
Caution
Only operate the web service within visual range of the system.
Make sure nobody is working on the system while you are making settings in the
web service or the system.
During teach-in, the coordinates of the racking system slots are taught into the station controller (PLC).
This is already set up on delivery.
Teach-in is only required:
–
After a collision involving the planar surface gantry
–
After a mechanical component has been moved or replaced
Teaching in rack locations
To be able to access the visualization, you need to open the web browser (Internet Explorer) on the station
PC enclosed. The visualization is set as the start screen here.
© Festo Didactic 8083287
Storing/Conveyor station
65