Error Diagnosis; Error Correction - ASO Safety Solutions ISK 74 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

11. Error diagnosis

Onl�� the green LED ma�� illuminate if the suppl�� voltage has been correctl�� connected. If one of the red
LEDs illuminate, there is an error in the s��stem which can be pinpointed with the aid of the LED.
LED
LEDs are not
The supply voltage is missing, too low or
illuminated
has been connected incorrectly
A single red LED
Contact edge(s) not connected, con-
is illuminated
nected incorrectly or faulty
One of the contact edge connections is
not being used
Both of the red
The transmission line is faulty or has
Transmit LEDs
been installed incorrectly
are illuminated
Contact edge(s) not connected, con-
nected incorrectly or faulty
*
If the error is not related to the s��stem's wiring, the proper function of the electronics can be tested
b�� connecting an 8.2 kW resistor to each of the SCE inputs on the ISK 74-31 electronic evaluation
s��stem (terminals Stationary Opening or Closing) and to the travelling coil core (connections
O and C). If the electronics work perfectl�� after performing the test, the safet�� contact edges
must be checked using an ohmmeter. To do this, the respective connection on the SCE for the
electronic evaluation s��stem or for the travelling coil core must be disconnected and connected
to an ohmmeter.
The resistance must be 8.2 kW ±500 W when the safet�� contact edge is inactive and must not
exceed 500 W when it is active.
** If both of the LEDs for the travelling SCEs (Transmit Opening and Transmit Closing) illuminate,
there is an error in the inductive signal transmission s��stem. The most frequent causes of these
errors are bad coil core connections, incorrectl�� installed cable s��stem components (see IKS
safet�� transmission s��stem assembl�� instructions) or an impermissibl�� low suppl�� voltage.
The maximum resistance value of the cable loop must not exceed 3 W . The resistance value can
be measured b�� disconnecting the steel cable from the ground terminal and then measuring the
resistance between the end of the steel cable and ground terminal.
Error
Check connections and supply voltage:
- 24 V AC/DC at terminal 24 V AC/DC or
- 230 V AC at terminals PE, L1 and N
Tolerance range: ±10%
- Check the connections of the corresponding con-
- Check safety contact edge(s)*
Any contact edge connections that are not being
used must be permanently bridged using one of the
supplied 8.2 kΩ resistors
- Observe the mech. assembly instructions
- Check transmission coil cores for abrasion.
- Check cable loop; make certain that both trans-
- Check cable / gate leaf contact points.
- Check supply voltage**
- Check the connections of the corresponding con-
- Check safety contact edge(s)*

Error correction

tact edge (squeezed or brittle supply lines, etc.)
(ISK safety transmission system)
mission coil cores are in the cable loop
tact edge (squeezed or brittle supply lines, etc.)
19

Publicité

Table des Matières
loading

Table des Matières