3. STORAGE

The machine is stored by the Manufacturer or Distributor.

4. INSTALLATION

The machine must only be installed by the Technician.
When the machine is being installed, the Techni-
cian must replace the water in the hydraulic cir-
cuits.
The machine's support base must be perfectly
flat, not incline by more than 2° and have no ir-
regularities.
The electrical system must be equipped with a
suitable residual-current device in compliance
with current laws and safety regulations.

5. COMMISSIONING

The machine must only be commissioned by the Technician.

6. OPERATION

6.1 Safety precautions

Carefully read the instructions provided in chap-
ter "I. SAFETY PRECAUTIONS" on page 25.

6.2 Emissions

Vibrations
Under conditions of use that comply with the instructions for
correct use provided in this manual, any detected vibrations
do not give rise to dangerous situations.
Sound emissions
The noise level emitted by the machine is on average lower
than 70 dB; therefore, there is no obligation to use personal
protective equipment for the auditory system.
Notify the Manufacturer if the machine emits unusual noises.
Electromagnetic environment
The machine is designed to work properly in any industrial
electromagnetic environment, falling within the Emission
and Immunity limits provided by current standards.
36
160
of

6.3 Machine initial start-up

During the machine's heating-up phase (roughly
20 minutes), the negative pressure valve will re-
lease steam for a few seconds until the valve clos-
es.
If the machine is inactive for longer than a week,
the Technician must replace 100% of the water
inside the hydraulic circuits.
Turn the power switch (9) to position "1" (electricity is sup-
plied to the pump to automatically fill up the machine's
heating unit and steam heating unit) and wait for the heat-
ing unit to be automatically filled with water.
Turn the main switch (9) to position "2" (full electricity is sup-
plied, including to the heating element in the heating unit)
and wait for the machine to fully warm up.
9
0
1
2
10
LED level (10) warnings
Flashes
The heating unit is being filled with water
Steady light
Water filling OK
When the timeout device cuts in due to a block
during the heating unit water filling phase, all the
LEDs on all the pushbutton panels will flash.

6.4 Turning off the machine

Turn off the machine via the machine's main switch.