Storage; Installation; Commissioning; Operation - Astoria SABRINA Manuel D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73
4.

STORAGE

The machine is stored by the Manufacturer or the
Distributor.
5.

INSTALLATION

The installation of the machine must be performed
only by the Manufacturer's Qualified Technicians.
During the installation the Qualified Technicians needs to renewal
operations of the water contained in the hydraulic circuits.
The base of the machine support must be perfectly level and
without irregularities.
The electric system must be equipped with a suitable differential
circuit breaker (30 mA).
6.

COMMISSIONING

The commissioning of the machine must be per-
formed only by the Manufacturer's Qualified Technicians.
52
244
of
7.

OPERATION

Safety precautions

7.1
Carefully read the instructions provided in chapter "2. SAFETY
PRECAUTIONS" on page 42.

Emissions

7.2
VIBRATIONS
In conditions of use that meet the indications pro-
vided in this manual, any detected vibrations do not give
rise to dangerous situations.
SOUND EMISSIONS
The noise level emitted by the machine is on average
lower than 70 dB; therefore, there is no obligation to use
personal protective equipment for the auditory system.
If the machine emits unusual noises, notify the manu-
facturer.
ELECTROMAGNETIC ENVIRONMENT
The machine is designed to work properly in an
electromagnetic environment of industrial type, falling
within the limits of Emission and Immunity provided by
current standards.

Turning the machine on and off

7.3
7.3.1 Version SAE
Proceed as follows :
Open the water tap of the water
mains and of the softener;
switch the main power switch
to the ON position (1), the boiler
water level indicator will begin
flashing (2);
wait for the boiler to automatically
fill with water: the indicator stops
flashing and remains on (2).
1
2
USER manual

Publicité

Table des Matières
loading

Table des Matières