Pic
Pic. . . . 3.5
Pic
Pic
3.5
3.5
3.5. . . . 3 3 3 3 – – – – Wall installation
3.6. Hang up installation
The Hang up installation can be made using the
supplied, special shaped hooks (Pic. 3.6.1). It is
necessary to prearrange three support chains where
to hang up the machine.
The chains must be as strightly vertical as possible,
and attached to connections able to sustain the
weight of the machine (see: Tab. 1.2.1) . Use metallic
chais, possibly stainless steel made, and anyway
made of a matherial not sensitive to humidity.
Observe the minimal distances written on Tab. 3.2.1.
mini NEB
Wall installation
Wall installation
Wall installation
• Make three holes diameter 6mm and 3mm
deep on the wall, as in Pic. 3.5.2;
Clean the holes internally.
Insert the three screw anchors keeping the
espansion fins on the vertical plane; fasten
the bracket with the three screws.
• Screw without tightening two of the four
screws necessary to fit the mini NEB to the
bracket, as represented in Pic. 3.5.3.
• Rotate the machine until the remaining two
holes on the machine coincide with the holes
on the bracket: the hoses and the power
supply cable must pass between the bracket
and the machine, in the dedicated space.
• Screw the last two screws, and finally fasten
all the four screws.
• Check the installation solidity.
Pic. . . . 3.6
Pic
Pic
Pic
6 / 10
3.6. . . . 1 1 1 1 – – – – Hooks
Hooks
3.6
3.6
Hooks
Hooks
M836-GB-1