3. Installation

3.1. Preliminary operations

To put in operation the MININEB it's necessary to have :
• Electrical Power Supply 230V/60Hz grounded and with protection devices.
• Water supply connection
• Water Drain connection
The installation must comply the requisites provided by the local safety regulations.
3.2. Positioning
The MININEB must be fitted as in Pic. 3.2.1, Pic. 3.2.2, Pic. 3.2.3, in horizontal position, with the air filter
directioned below, leaving a correct space from the ground. Any other positioning compromizes the
correct performance of the machine.
3.2.1. Minimal distances
Pic. . . . 3.2
Pic
Pic
Pic
minimal l l l
minima
minima
minima
suggested
suggested
suggested
suggested
M836-GB-1
3.2. . . . 1 1 1 1
3.2
3.2
A A A A
2 m
3 m
Pic. . . . 3.2
Pic
3.2. . . . 2 2 2 2
Pic
Pic
3.2
3.2
B B B B
0,5 m
1 m
3 / 10
Pic. . . . 3.2
Pic
3.2. . . . 3 3 3 3
Pic
Pic
3.2
3.2
C C C C
D D D D
0,05 m
0,8 m
1,5 m
1,5 m
Tab.
Tab. 3.2
3.2. . . . 1 1 1 1
Tab.
Tab.
3.2
3.2
mini NEB