Inverter Configuration; Navigation; Power And Frequency And Power Factor; Voltage And Current And Max Demand - IMEON ENERGY IMEON 9.12 Guide De Montage

Masquer les pouces Voir aussi pour IMEON 9.12:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9.3 Inverter configuration

Configure the inverter via IMEON MANAGER WEB, tab « Manager/Flow »:
1. Select the function mode « Smart-Grid »
2. Press the button « OK »
3. The symbol
should be displayed on the Smart Meter

9.4 Navigation

9.4.1 Power and Frequency and Power Factor

Each successive pressing of the
1.
Instantaneous Active Power in kW
2.
Instantaneous Reactive Power in kVAr
3.
Instantaneous Volt-amps in KVA
4.
Total kW, kVArh, kVA
5.
Frequency and Power Factor (total)
6.
Power Factor of each phase
7.
Maximum Power Demand

9.4.2 Voltage and Current and Max demand

Each successive pressing of the
1.
Phase to neutral voltages (V)
2.
Phase to phase voltages (V)
3.
Current on each phase (A)
4.
Neutral current (A)
5.
Maximum Current Demand (A)

9.4.3 Energy measurements

Each successive short pressing (lasting less than 3s) of the
1.
Total active energy in kWh. Total kWh=imported +exported (kWh)
2.
Total Imported active energy in kWh
3.
Total Exported active energy in kWh
4.
Total reactive energy in kVArh. Total kVArh=imported +exported (kVArh)
5.
Imported reactive energy in kVArh
6.
Exported reactive energy in kVArh
Manuel d'installation / Installation guide IMEON 9.12 – Rev A.8
IMEON 9.12
button selects a new range:
button selects a new range:
button selects a new range:
FR
FR
EN
133

Publicité

Chapitres

Table des Matières
loading

Table des Matières