F – CONNECTING AC OUTPUT
Procedure
Check the « AC
F1
OUTPUT » wiring
connector.
Open the circuit-
FR
breaker located
F2
between the inverter
FR
EN
and the load.
Connect the plug on
the «AC OUTPUT»
F3
socket of the inverter.
Leave open the circuit-
breaker located
F4
between the inverter
and the consumers.
140
IMEON 9.12
Specifications
The maximum power of the load must not exceed
9kW.
Use adapted cross- section cables taking into
account the length of the cables and the current.
Measure the output voltages after the circuit-
breaker :
L1/N - L2/N et L3/N = 0 Vac
L1/Ground - L2/ Ground et L3/ Ground = 0 Vac
N/ Ground = 0 Vac
If not, check the wiring.
When connecting « AC OUTPUT » plug, ensure that
there are no consumers connected.
Ensure that the connector is correctly set in place.
Measure the output voltages after the circuit-
breaker :
L1/N - L2/N et L3/N = 0 Vac
L1/Ground - L2/ Ground et L3/ Ground = 0 Vac
N/ Ground = 0 Vac
Guide de montage / Installation guide IMEON 9.12 – Rev A.8
Measures /
Test
Observations