IMEON ENERGY IMEON 9.12 Guide De Montage page 100

Masquer les pouces Voir aussi pour IMEON 9.12:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 2: Check polarity of the battery bank and identify the positive "+"and the negative "-" terminals.
WARNING: Incorrect polarity of the battery bank will damage the inverter! Check the system
before connecting the batteries.
FR
FR
EN
Step 3: Switch the breaker and fuses to OFF position, in order to avoid electric arcs and the risk of
damage.
Step 4: Use two battery cables. Remove 30 mm of the insulation sleeve (a), insert into cable ring
terminal and crimp it with a dedicated crimping tool (H type), then insert it into the connector
(b).
(a)
Step 5: Make sure the cables are correctly connected.
Step 6: Plug the battery connector into IMEON's "DC BATTERY" socket.
100
IMEON 9.12
Guide de montage / Installation guide IMEON 9.12 – Rev A.8
(b)

Publicité

Chapitres

Table des Matières
loading

Table des Matières