G – COMMISSIONING OF THE IMEON INVERTER
Procedure
Check all plugs
G1
connections of the
inverter.
Hold pressed the
button of the
G2
inverter during 3
seconds until you
hear a sound signal.
Check the output
G3
« AC OUTPUT »
wiring.
Ensure that there are
no consumers
connected.
G4
Close the circuit-
breaker located
between the inverter
and consumers.
It is now possible to connect the consumers of the electrical installation.
The commissioning of the IMEON Smart Inverter is now complete.
Manuel d'installation / Installation guide IMEON 9.12 – Rev A.8
IMEON 9.12
Specifications
Ensure that all the plugs:
« AC OUTPUT»,
«GRID CONNECTION»,
«+PV INPUT-»
«+DC BATTERY- »
are correctly set in place.
Check with the LCD display the information:
«GRID CONNECTION»
« AC OUTPUT»
«+PV INPUT»
«+BATTERY-».
Measure the output voltages before the circuit-
breaker : (Opened since the F4 step)
L1/N - L2/N et L3/N = 230 Vac
L1/Ground - L2/ Ground et L3/ Ground = 230 Vac
N/ Ground = 0 Vac
If not check the wiring.
Measure the output voltages after the circuit-breaker :
L1/N-L2/N et L3/N = 230 Vac
L1/Ground-L2/ Ground et L3/ Ground = 230 Vac
N/ Ground = 0 Vac
Measures /
Test
Observations