IMEON ENERGY IMEON 9.12 Guide De Montage page 136

Masquer les pouces Voir aussi pour IMEON 9.12:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

C – CONNECTING + DC BATTERY –
C1
Check the battery bank cables.
FR
FR
EN
C2
Open the battery fuse holder switch.
C3
Close the battery fuse holder switch.
C4
Open the battery fuse holder switch.
136
IMEON 9.12
Procedure
Guide de montage / Installation guide IMEON 9.12 – Rev A.8
Specifications
Use adapted cross- section cables
taking into account the length of
the cables and the current.
The battery connection must be
respected as indicated in the
above diagram.
Check +/- voltage of the battery
bank before the fuse holder.
Ensure that the DC battery voltage
is between 42 Vdc and 56 Vdc. If
not check the cables.
Measure the DC voltage +/- on the
battery plug which is to be
connected to the inverter socket.
Check polarity of the battery bank
and identify the positive "+"and
negative "-" terminal block.
Ensure that the battery voltage is
between 42 Vdc and 56 Vdc.
Connect the battery plug to the
socket «+DC BATTERY-» of the
inverter. Ensure that the plug is
correctly in place. Ensure that the
voltage +/- = 0 Vdc.
Measures /
Test
Observations
checked

Publicité

Chapitres

Table des Matières
loading

Table des Matières