Menu: Additional Programs - Daikin RoCon+ HP1 ETSH16P30D Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 117
7
Parameter settings
7.6.6

Menu: Additional programs

[→ Main menu → Configuration → Addition]
Parameters
Setting range
Min / Max
Relay test
Output J1
Output J14
Output J2 con-
tact A
Output J2 con-
tact B
Output J12 3UV
DHW open
Output J12 3UV
DHW closed
Connection J3
N/O contact B
Connec. J3
changeover
contact A
Output J10
Output J17 relay
K2
Output J17 relay
K1
Output J17 relay
K3
Ventilation
function
Off
On
Screed
Off
On
Screed pro-
10 – 70 °C per
gram
heating day
Tab. 7-18 Parameter in the "Additional programs" menu
Operating Instructions
42
Description
Manual control of individual relays for test purposes. After confirmation of
this parameter with the rotary button, the list of relays 1 – 9 is displayed
with a checkbox on the display. For selection and confirmation of a relay
with the rotary button, a tick is placed in the checkbox and the respective
relay is activated. Multiple selection is possible.
Output J1 (internal heating circulation pump), output pump
Output J14 (circulation pump), mixer "Open"
Contact A on output J2 (switching valve 3UVB1), mixer "Closed"
Contact B on output J2 (switching valve 3UVB1)
Output J12, switching valve 3UV DHW "Closed"
Output J12, switching valve 3UV DHW "Open"
Connection J3 (potential-free relay: normally open B-B1) – AUX
Connection J3 (potential-free relay: Changer A-A1/A-A2) – AUX
Output J10 (A1P power supply)
Output J17 (pin 3) – relay K2 (RTX-EHS) output XBUH1 T2
Output J17 (pin 2) – relay K1 (RTX-EHS) output XBUH1 T3
Output J17 (pin 4) – relay K3 (RTX-EHS) output XBUH1 T1
Activation of automatic ventilation of the Daikin Altherma ETS(X/H) and the
connected HC.
Deactivated
Start of the ventilation function
Function for screed drying
Deactivated
The feed target temperature is regulated according to the set [Screed pro-
gram]. The day on which the screed function is activated is not included in
the running time of the screed program. The first day starts when the day
changes at 00:00 am. On the day of activation, heating is carried out for
the remaining time with the feed target temperature of the program of the
first day (see
Chap.
4.5.7).
Setting of the sequence program of the screed heating. An individual feed
target temperature can be set for each day for a maximum duration of 28
days. The end of the screed program is defined by the 1st day with the tar-
get value setting "Off" (see
Chap.
4.5.7).
Factory
Incre-
Access
setting
ment
BE HF
-
-
N
E
-
N
E
-
N
E
See
1 °C
N
E
Chap. 4.5.7
Daikin RoCon+ HP
Daikin controller RoCon+ HP1
008.1447899_00 – 09/2019 – EN

Publicité

Table des Matières
loading

Table des Matières