SECTION B – POINT 3
START-UP, USE AND ADJUSTMENTS
One single trained operator is sufficient for use of the machine.
IMPORTANT WARNINGS!
Before starting the machine, follow the instructions below:
1. 1Check that the machine voltage, specified in the identification label illustrated in Section
A point 1, corresponds to the line voltage at the socket. If not, suspend electrical connec-
tion operations and call the supplier or manufacturer.
2.
Check that the spiral arm rotates in an anticlockwise direction.
The controls are listed below with illustrations to facilitate understanding of the start-up se-
quences (for electronic panel and electromechanical panel).
MACHINE CONTROLS:
NSE 30-NSE 45-SPIRAL 50E-SPIRAL 70E– NSE 60-SPIRAL 80E-NSE 80-SPIRAL 110-
NSE 100-SPIRAL 150E- NSE 130 –SPIRAL 200 3E—NSE 160—NSE 200—SPIRAL 300E
Key
:
1
Membrane keyboard panel
st
2
1
speed time display
st
3
1
speed time "up" key
st
4
1
speed time "down" key
nd
5
2
speed time display
6
2nd speed time "up" key
7
2nd speed time "down" key
8
Program no. display
Program selection/program con-
9
firmation key
Figure n°24
N.B.: If a "TSE" tilting machine
is coupled to this spiral mixer,
pls refer
to "TNSE" manual
book too.
10
Programming led
11
Automatic operation key
12
Automatic operation led
13
Bowl inversion key (*)
14
Bowl inversion led
15
Cycle start
16
Cycle stop
17
Mushroom-headed emergency button
18
Master switch
25