Safety Inspection Checklist; Rail System; Electrical Connections - Invacare Robin Manuel De Maintenance

Masquer les pouces Voir aussi pour Robin:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 65

4.4 Safety Inspection Checklist

IMPORTANT!
– Perform this inspection every 12 months.

Rail system

q
Check that all brackets are tightened correctly to the ceiling/wall.
Retighten, if necessary.
q
Check reinforcement. If not possible, do a load test with 1.5 x
rated load for 20 minutes.
q
Check and retighten end stops.
q
Systems with track connections: Check if the connection has
become misaligned during use. Re-align if needed.
q
Check trolley and traverse trolley.
q
Check trolley wheels for smooth movement and abnormal noise.
q
Check friction break adjustment on trolleys. Adjust if necessary.
q
Do a load test with rated load through the entire system.
q
Place a sticker with a new date for the next inspection.
Rail system with transit coupling connections:
q
Check the lock fixtures:
– secure to tracking
– each claw moves independently
– correctly aligned with tracking slots
– no obstructions to prevent correct function
– safety plate is fitted.
q
Check traverse trolley mounting fixtures.
q
Check tracking alignment. Re-align if necessary.
q
Function test transit coupling / lock fixture (10 times - disable
left / right claw x 5).
q
Check that gap between track and transit coupling is max. 3 mm.
q
Function test under load (5 cycles with Safe Working Load).
q
Check inlay plate is fitted (L and M rail).
1586747-A
Ceiling hoist
q
Check suspension and cross pin.
q
Check steel and plastic gearwheels for wear and damage.
If gearwheels are dry, apply gearwheel grease.
q
Check loose strap sensor and adjust if necessary.
q
Check straps for wear and damage.
q
Check guide cylinder and end stops.
q
Check the lifting hooks, screws and pins for wear and damage.
q
Check that a sticker with maximum load is placed on the hoist.
q
Do a full lifting cycle with rated load — must be effortless and
without jarring sound.
q
Place a sticker with a new date for next inspection.

Electrical connections

q
Check that all cables are intact.
q
Check for rupture on cables and on isolation.
q
Check micro switches for clamping and mechanical function.
q
Check the charger for damage / function.
q
Check hand control for damage and function. Make sure that
the hand control is connected correctly.
q
Check the emergency stop.
q
Check the emergency lowering.
Serial Number:
Inspection Date:
Inspected by:
Comments:
Maintenance
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Robin mover

Table des Matières