Télécharger Imprimer la page

Measuring An Otdr Link - JDSU OTU-8000 Manuel De L'utilisateur

Masquer les pouces Voir aussi pour OTU-8000:

Publicité

Les langues disponibles

Les langues disponibles

Measuring an OTDR link

Fig. 64
List of possible tests for a link
5 Click on
Start
to perform the test
6 Once the test is completed, the trace is displayed.
Fig. 65
Test result
The status Available is displayed in the Configuration box.
If the test or measurement has not been completed successfully, the
status Failed is displayed and no trace is visible.
1 Select from the list, the link to measure.
2 Click on the Test tab and check Measurement.
3 Click on
Submit
to validate.
The Measurement configuration page is displayed.
4 Configure the Measurement parameters (as seen in
page
54):
– Auto configuration: all parameters are automatically configured by
the OTU-8000.
– Manual configuration: the parameters are configured by the user.
User Manual
7OTU80050/01
Chapter 4 Operating the OTU-8000
Exploitation
Figure 66 on
53

Publicité

Chapitres

loading

Ce manuel est également adapté pour:

Eotu8000e