Operating Unit; Transport - Leister GEOSTAR G5 Instructions D'utilisation

Masquer les pouces Voir aussi pour GEOSTAR G5:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operating unit

27
28
29
30

Transport

Do not use handles on the device or
carrying handles on the transport box
for transport with the crane.
Suitable transport equipment must be
used to transport the machine.
42
31
32
33
35
36
34
26.
27. Button "Up"
28. Button "Down"
29. Button for heating "On/O "
30. Button for drive "On/O "
31. Status LED
32. "e-Drive"
33. Function display
34. Working display
35. Status display "Section 1"
36. Status display "Section 2"
The welding wedge (5) must
be cooled down for transport.
Do not store any fl ammable
materials in the transport box

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Geostar g7

Table des Matières