Leister GEOSTAR G5 Instructions D'utilisation page 65

Masquer les pouces Voir aussi pour GEOSTAR G5:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Welding wedge replacement
It must be ensured before dismantling that the device is switched o with the main switch (2) and
the power cord is disconnected from the mains.
A. Rotate the ring on the welding wedge plug (13) counterclockwise until it hits the stop.
Pull o the welding wedge plug (13) from the device.
B. Loosen the welding wedge locking screw (24) with the socket wrench (wrench size 5 mm).
C. Loosen the cylinder screws (50) with the socket wrench (wrench size 5 mm).
Pull o the welding wedge unit towards the rear.
D. Move the new welding wedge (5) inward into the guide (51).
E. Tighten the welding wedge locking screw (24).
F. Tighten the cylinder screws (50) with 8.8 Nm.
G. Insert the welding wedge plug (13) back into the socket (54) and tighten the ring on the welding wedge
plug (13) clockwise until it engages.
A
13
D
51
G
13
54
B
E
5
24
CAUTION!
After the replacement of the welding wedge, it is mandatory
to have the factory setting (point A–D) applied (see chapter
welding wedge position factory setting).
C
24
50
F
50
65

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Geostar g7

Table des Matières