Receiver Installation - Horizon Hobby HANGAR 9 Carbon Cub FX-3 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

RECEIVER INSTALLATION

102. Remove the screws holding the cockpit fl oor inside the
fuselage.
103. Mount the receiver securely in the fuselage.
 The battery packs will be located next to the
fuel tank to correctly balance your model.
104. Secure the remote receivers in the fuselage. Use the
instructions provided with the receiver as a guide in their
location
EN
105. Connect the leads for the fl aps and ailerons to the receiver.
Route the leads for the ailerons, fl aps and position light
through the hole in the cockpit fl oor. The aileron and fl ap
leads can be routed out the sides of the fuselage. Secure all
leads inside the fuselage.
18

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hangar 9 han5280

Table des Matières