Télécharger Imprimer la page

Handling Of The Ups - LEGRAND KEOR HPE Manuel De Fonctionnement

400-500 kva
Masquer les pouces Voir aussi pour KEOR HPE:

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 400-500 kVA
Installation et démarrage de l'ASI KEOR HPE 400-500 kVA
Installazione e avviamento KEOR HPE UPS 400-500 kVA
3.2

HANDLING OF THE UPS

The UPS is packed on a pallet. It is handled from the transport vehicle to the installation (or storage)
place via a fork lift.
The device has a heavy weight
 Avoid turnover during the transport of the UPS.
 Cabinets must always be handled in upright position.
 During loading and unloading operations, always respect the indications
regarding the device barycentre marked on the package.
Before positioning the UPS, in order to avoid risks of turnover, it's recommended to move the system
on the wood pallet on which the UPS is fixed. Before the positioning in the final location, remove the
UPS from the pallet.
To handle the UPS remove the lower rear and front, insert the forks of a fork lift. The UPS can be
handled from the front according to the available spaces, as shown by the following picture.
Picture 2 – Handling of the KEOR HPE UPS 400-500 kVA
457
457
OMT87187 REV. A
21

Publicité

loading