Enodis Cleveland MKDL-40-T Manuel De L'opérateur page 4

Marmites malaxeuses à vapeur directe
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
GENERAL
Operating criteria
Ambient air Temperature
Relative Humidity
Altitude
Voltage
Installation of the kettle must be accomplished by qualified electrical installation personnel
working to all applicable local and national codes. Improper installation of product could cause injury or
damage.
Note: Maximum voltage for LVD (low volt directive for Europe) to be 440 volts for CE marked
appliances.
INSPECTION
Before unpacking visually inspect the unit for evidence of damage during shipping.
If damage is noticed, do not unpack the unit, follow Shipping Damage Instructions shown below.
SHIPPING DAMAGE INSTRUCTIONS
If shipping damage to the unit is discovered or suspected, observe the following guidelines in
preparing a shipping damage claim.
1. Write down a description of the damage or the reason for suspecting damage as soon as it is
discovered. This will help in filling out the claim forms later.
2. As soon as damage is discovered or suspected, notify the carrier that delivered the shipment.
3. Arrange for the carrier's representative to examine the damage.
4. Fill out all carrier claims forms and have the examining carrier sign and date each form.
INSTALLATION
The first installation step is to refer to the Specification Sheets or Specification Drawings for detailed
clearance and drain requirements in order to determine the location of the kettle. Next, carefully cut
open the shipping carton for easy removal of the kettle.
CLEARANCE REQUIREMENTS
18" is recommended for service access on the rear of kettle, 0 on the left side and 4" on the right. If
adjoining equipment is over 36" high allow 4" clearance on right side.
Acceptable Range
15°C to 40°C
0-80%
0 to 3000 meter
See 'Electrical Connection"

Publicité

Table des Matières
loading

Produits Connexes pour Enodis Cleveland MKDL-40-T

Table des Matières