Iberspa SM-USO Manuel D'utilisation Et D'installation page 27

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 116
THREE PHASES 400V
J60
J41
230V
OFF
3 ϸ
3x16A
A2
TB1
A5
1
Line 1
1 BRN
2
Neutral
BLU
Line 2
2 BRN
3
Line 3
3 BRN
4
Ground
GRN
4
230V 3 ϸ 3x16A
OFF
ON
A2
4
A3
A5
TB1
4
Line 3
3 BRN
1
Line 1
1 BRN
Neutral
BLU
2
Line 2
2 BRN
3
Ground
GRN
ATTENTION
Correct earthing is essential
The earthing circuit of the building should always be in perfect condition
to guarantee the safety of Spa users. If you have any doubts on this,
ensure that the earthing circuit is checked by a duly qualified person. The
manufacturer will not be held responsible for possible damage caused by
incorrect maintenance of the earthing circuit.
Fasten the earth cable (yellow and green) to the terminal on the outside of the control
cabinet as shown in the following diagram:
Bonding
Lugs
1
Three-phase line 380V III
J46
BP21G1WL
2
J38
Remove bridges;
3
J51-J88 and J52-J62
J53
J58
Changes this bridges
J1
J6
J60-J36 -> TO J60-J45
J41-J12 -> TO J41-J79
208
Three-phase line 400V
1
BP013G1 & BP013G2
Unfused
Remove jumpers:
connecting J51 and J58
connecting J52 and J36
3
Changes this bridges:
J41 -J53 -> TO J41 - J54
J60-J12 -> TO J60-J45
Put DIP switches A5 on OFF and
A2, A3 on ON position.
209
EARTH
017
Power requirements:
3 Services 5 wires: Line 2, Line2,
Line 3, Neutral, Ground 400VCA,
50/60Hz 3 phase, 16A (Circuit
breaker rating = 20A max each
phase line).
Power requirements:
3- Service 5 wires: Line 2, Line
2, Line 3, Neutral, Ground
400VCA, 50/60 Hz* 3 phase, 16A
(Circuit breaker rating = 20A max
each phase line).
automatically detect 50Hz vs 60Hz
WARNING
Do not connect the electricity
(differential in the ON position)
until the Spa is filled with water.
ENG
*
BP systems
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ins-pr

Table des Matières