Assembling The Fan Group; Assembling The Tank Group; Assembling The Control Group - Fort VISION Manuel D'utilisation Et D'entretien

Masquer les pouces Voir aussi pour VISION:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
Fig. 19 - PTO connection
1) Power take-off connection of the machine. - 2) Plug for
connection to the socket (12 Volt) on the machine.
7) Screws (2, one on each side) for fixing the tank to the bum-
per of the machine.
8) Front bracket to support the tank.
9) Front bracket fixing screws.
10) Tank locking screws to the bracket.
11) Tank storage support brackets (#2, one on each side).
12) Centering holes (#2) for fixing tank support brackets.
13) Coupling pipe to the front bracket.
14) Tank group stabilizer roller.
6.2.1
ASSEMBLYING THE FAN GROUP (1 FIG. 17)
1) Using a hoist, safely harness the fan group (1 Fig. 17) and
position it so that the connection to the power take-off (1
Fig. 18) appears at the grooved pin (2 Fig. 18).
2) Match the power take-off coupling with the slotted pin and
push the fan group until it is in place at the bottom of the
power take-off seat.
3) Rotate the latch pin lever (3 Fig. 19) so that the sleeve and
the PDF connection are a single body. This means that the
connection is correct.
4) Remove the hoist paying attention to the stability of the
fan/machine group.
The stabilizer roller (4 Fig. 18) must be well supported on the
ground.
5) Insert the 12 Volt plug (3 Fig. 18) to the socket on the trac-
tor (2 Fig. hopper.
6) After verifying that the fan group has been installed cor-
rectly, start the machine and use the relative controls to lift
the group so that the unit is raised off the ground.
7) Turn off the machine.
Use and maintenance ATOMIZER ON VISION MULTIFUNCTION MACHINE
3
1
1
Fig. 20 - Control group fixing bracket
1) Control group fixing bracket. - 2) Control group bracket
locking screw.
6.2.2
ASSEMBLING THE TANK GROUP (2 FIG. 17)
1) Install the front tank support bracket (8 Fig. 18) and secure
it firmly with a 17 mm wrench, using the screws (9 Fig. 18).
2) Using a hoist, safely harness the tank group (2 Fig. 17)
and keeping it raised let it descend so that the two tank
support brackets (11 Fig. 18) match the two centering ho-
les (12 Fig. 18).
At the same time, pay attention that the tank coupling tube
(13 Fig. 18) go into the two hooks of the front support bra-
cket (8 Fig. 18).
3) Insert the tank locking screws (10 Fig. 18) and after ensu-
ring the correct insertion of the tank group in the brackets,
tighten the screws in position using a 17 mm wrench (10
Fig. 18).
5) Insert the stabilizer roller (14 Fig. 18) fixing it with the rela-
tive screws, on the holes prepared for this purpose so that
it appears about 10-15 cm from the ground.
6) Remove the hoist, paying attention to the stability of the
tank group.
6.2.3
ASSEMBLYING THE CONTROL GROUP
(3 FIG. 17)
1) Unscrew the tightening screw (2 Fig. 20) of the control unit
support bracket so as to be free from blockages.
2) Position the bracket, complete with the control unit, on the
roll-bar in a convenient position to the Operator, positioned
in the driver's seat.
3) Tighten the bracket, re-introduce the clamping screw (2
Fig. 20) and lock the control unit in place.
2
63

Publicité

Table des Matières
loading

Table des Matières