Fireplace (Zp); Brine Earth Heat Exchanger (Zp 1) - Maico WR 310 Notice De Mise En Service Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CO
value control voltage 0 V/10 V
2
VOC value control voltage 0 V/10 V
Rel. humidity control voltage 0 V/10 V
Parameter
CO
value
2
control voltage 0 V
CO
value
2
control voltage 10 V
VOC value
control voltage 0 V
VOC value
control voltage 10 V
Rel. humidity
control voltage 0 V
Rel. humidity
control voltage 10 V
Control voltages 0 V and 10 V are used to de-
fine the characteristic curves of the sensors.
The sensor characteristic curve must be linear

6.7 Fireplace (ZP)

Additional circuit board "ZP" = accessory for
310/410 320/470
ventilation units:
160 Flat 300 Flat
.
with additional circuit board "ZP".
Parameter
Fireplace
safety function
Activates the fireplace function if the ven-
tilation unit is operated in conjunction with
a fireplace. After installation, the optional
additional circuit board must be switched to
active with "yes".
Setting
0 ... 800 ... 900 ppm
900...1230...3000 ppm
0 ... 800 ... 900 ppm
900...1230...3000 ppm
0 ... 100 % rel. hum.
0 ... 100 % rel. hum.
170
Function can be activated
Setting
no / yes
6 Settings main menu | UK
6.8 Brine earth heat exchanger
(ZP 1, switching contact HP)
Additional circuit board "ZP 1" = accessory for
310/410 320/470
ventilation units:
. Option for connecting to
160 Flat 300 Flat
main circuit board with switching contact „HP"
on
310/410 320/470 160 Flat 300 Flat
Trio
.
Parameter
Brine earth
heat exchanger
Control of brine
circulating pump
T-air inlet offset,
heating
T-air inlet
hysteresis heating
T-air inlet
hysteresis cooling
310/410 320/470
i
160 Flat 300 Flat
Pre-requirements for the additional
circuit board 1: DIP switch of ZP 1 set
to brine earth heat exchanger and acti-
vated with brine earth heat exchanger
parameter.
Additional circuit board 1 can be used to
control a brine geothermal heat exchanger
with a controlled or uncontrolled pump.
A brine earth heat exchanger with an un-
controlled pump can be controlled via the
switching contact.
310/410 320/470 160 Flat 300 Flat
i
Trio
For connection on switching contact
 chapter 6.2. For additional infor-
mation  chapter 9.1.
Pre-requirements for the additional circuit
board 1:
DIP switch of ZP 1 set to brine earth heat
exchanger and activated with brine earth heat
exchanger parameter.
170
Setting
no / yes
controlled / uncon-
trolled
0 ... 2 ... 5 K
1 ... 6 K
2 ... 6 K
170
75

Publicité

Table des Matières
loading

Table des Matières