2.6 - Hydraulic diagram
Control lever
3

Testing, transport, delivery and installation

3.1 - Testing

The machine you have has been tested at our factories to check the correct run-
ning and adjustment.
3.2 -

Delivery and moving the machine

All the material sent has been carefully checked before delivery to the shipping
company. With the exception of different agreements with the client or particularly
expensive transport, the machine will be wrapped in nylon and cardboard.
The package dimensions are shown in fig. 3.2.1
Ingombro (mm)
BF+15F
BF+25F
A
1480
1480
B
760
760
C
640
640
13
LEGEND
A = Electrical motor
B = Central station
C = Tank
D = Distributor
E = Tap
F = Oleodynamic cylinder
G = Pressure gauge
Fig. 2.6.1
BF+35F
BF+50F
1480
-
760
-
640
-
Peso LORDO (Kg)
BF+15F
BF+25F BF+35F
63
103
Fig. 3.2.1
BF+50F
126
-