EdilKamin IDROPELLBOX Installation, Usage Et Maintenance page 38

Masquer les pouces Voir aussi pour IDROPELLBOX:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 42
4
3
2
fi g. C
SEASONAL MAINTENANCE (implemented by the DEALER)
Before performing any maintenance, disconnect the appliance from the mains.
• Clean the thermal stove internally and externally
• Carefully clean the heat exchange tubes
• Carefully clean and remove dirt from the combustion chamber and the relative compartment
• Clean the motors, verify mechanical and clam loosening
• Clean smoke channel (replace seals on pipes and smoke extraction fan chambe).
• Check the expansion tank
• Check and clean the circulator
• Check the sensors
• Check and if necessary replace the clock battery on the control board
• Clean, inspect and scrape any residue from the ignition resistance compartment and if necessary, replace it
• Clean/check the Synoptic Panel
• Visually inspect the electrical wires, connections and power cable
• Clean the pellet hopper and check loosening of the feed screw - gear motor assembly
• Check and if necessary replace the door seal
• Functionality test: load the feed screw, ignite, let it run for 10 minutes and shutdown
N.B.:
1) If maintenance if not implemented, the warranty will be rendered null and void.
2) If the boiler-fi replace is used very often, it is recommended to clean the smoke channel every 3 months.
After implementing a normal cleaning procedure, INCORRECT coupling of the upper (A) (fi gura F) and lower (B) (fi gura
F) combustion chambers can compromise the boiler-fi replace's performance. Therefore, before igniting the boiler-fi repla-
ce, ensure that the combustion chambers are correctly coupled as shown in (fi gura G).
7
fi g. E
MAINTENANCE
4
5
fi g. D
ATTENTION !!!
A
B
fi g. F
- 38
-
6
fi g. G

Publicité

Table des Matières
loading

Table des Matières