External
intake
NOTES ON FITTING THE COVERING
• If using a prefabricated Edilkamin covering, In order to defi ne
the exact position of the IDROPELLBOX, it is important
to check which covering will be used to complete it.
Positioning differs according to the model chosen (see assem-
bly instructions given in the packaging of each covering).
Always check that installation is perfectly vertical and horizon-
tal.
• Before installing the covering, check that all connections,
commands and moving parts are perfectly functional.
• Check this with the boiler-fi replace on and working for a few
hours. Do so prior to fi tting the covering in order to intervene
as necessary.
Finishing works, such as construction of the counter-hood,
covering assembly, pilaster preparation, painting, etc.,
should be carried out once the fi nal test has been passed.
• Edilkamin will therefore not be held liable for any charges
deriving from both demolition and reconstruction works,
even where consequent to replacement of any faulty boiler-
fi replace parts.
INSTALLATION
*
Internal mantel
ventilation grilled
Warm air outlet
at the front
*
Recycled air intake
N.B.: IMPORTANT FOR INSTALLATION CONDITIONS
There must be two ventilation grilles (surfaces greater than
300cm²); the fi rst must be at a height which is lower than the
hearth, while the second must at a height greater than 30 cm
with respect to the upper profi le of the outlet.
These grilles prevent the accumulation of heat inside, which is
then used to help heat the room of installation.
• Rather, at least 1 cm. (approx.) space must be left to allow
air to fl ow, thereby preventing heat from accumulating. The
counter-hood can be created from fi reproof plasterboard panels
or plaster sheets. When creating this, the air circulation grill
must be included, as previously specifi ed.
• During the construction phase of the covering it is funda-
mental to ensure that the combustion air is restored
to prevent pressure phenomena in the room where the
boiler-fi replace is installed (refer to the Chapter regarding
the external air inlet on page 29)
• In addition to the above, always consider the indica-
tions given by paragraphs 4.4 and 4.7 of standard UNI
10683/2005 "insulation, fi nishes, coverings and safety
recommendations".
CREATING THE MANTEL
• the mantel can be constructed with fi re resistant panels in
plasterboard or gypsum board.
• aeration grilles for preventing any excess temperature
inside must be provided for during construction.
- 30
-