Shutdown
While the boiler-fi replace is working pressing the 0/1 key for 2
seconds begins the shutdown process and "OFF" is displayed
(for 10 minutes). The turning off phase includes:
- The interruption of falling pellets
- The circulation of running water.
- Smoke extractor operating at maximum speed.
- Air ventilation
Never pull the plug during shutdown.
N.B. Please note that the circulator runs until the water tempe-
rature drops below 40° C.
Setting the clock
Press the MENU button for 2 seconds and use the + and – keys
to follow the instructions given on the display to access the
'Clock' menu. This allows you to set the time on the electro-
nic control board. Then press MENU and the following data
appears in sequence – this can be adjusted: day, month, year,
hour, minutes, day of the week. When 'Save?' appears on the
display, you can check that the settings have been entered cor-
rectly before confi rming. Press MENU to save the information
('Save OK' then appears on the display).
Programmer to ignite and shutdown the thermal stove at
various times during the week.
Press the MENU button on the remote control or the synoptic
panel for 2 seconds to access the time setting function and
press the + key to access the weekly timer function 'Program
ON/OFF' will appear on the display. The timer allows you
to set a number of ignitions and shutdowns per day (up to a
maximum of three), for each day of the week. As you confi rm
via the MENU button, one of the following options will appear:
- No Prog. (no program is set)
- Program/daily (a single program is set for every day)
- Program/weekly (a program is set for each day of the week)
Move from one to the other using the + and – keys.
Use the MENU button to confi rm the 'Daily program'option
and access the selection of the number of programs (ignition/
shutdown) to be set per day. Use the 'Program/daily' option to
set the identical program/s for every day of the week.
The following will be displayed if the + key is pressed:
- No Prog.
- Prog. No. 1 (one ignition and one shutdown per day), Prog.
No. 2 (same as before), Prog. No. 3 (same as before)
Use the button to show them in reverse order. If the 1st pro-
gram is selected, the ignition time is shown.
The display shows: 1 Ignition Hour 10.30; use the +/– keys to
change the hour and press MENU to confi rm.
The display shows: 1 Ignition Minutes 10.30; use the +/– keys
to change the minutes and press MENU to confi rm.
In the same way, adjust the shutdown times.
The program is confi rmed by pressing the MENU button when
"Saved" appears on the display.
When confi rming 'Program/week', you will need to choose the
day to which the program is to apply:
1 Mon; 2 Tues; 3 Wed; 4 Thurs; 5 Fri; 6 Sat; 7 Sun
Once you have chosen the day by scrolling through them with
the + and – keys, confi rm by pressing MENU and proceed
with the settings of the programs in the same way as for the
'Program/daily', selecting whether or not to enable a program
for each day of the week and choosing the number and times
of interventions. Should you make a mistake whilst setting
the programs you can exit without saving by pressing the 0/1
key and 'Saved' will appear on the display. Should the hopper
run out of pellets, the stove will block and 'Stop/Flame' will
appear.
INSTRUCTIONS FOR USE
- 35
Pellet reserve warning
The boiler-fi replace is equipped with an electronic pellet detec-
tion system.
The pellet detection system is integrated into the electronic
control board, allowing the stove to monitor how many kilos of
pellets are left.
This verifi cation is implemented at any point whilst the stove is
in operation mode.
For correct system operation, it is important that the following
procedure is adhered with during the fi rst ignition (that must
be implemented by the DEALER). Before starting to use the
pellet detection system, you must load and consume a full sack
of pellets.
This allows for a brief running-in of the loading system.
Subsequently load 15 kg of pellets.
Then press the 'reserve' button once, thereby storing the data
into the memory that 15 kg have been loaded.
From now on the display will show the remaining pellets as
they decrease in kg (15...14...13). Each time pellets are reloa-
ded you must
enter the quantity. E.g. when loading 15 kg, simply press the
'pellet load' button to enter this into the memory.
For other quantities, or in the event of an error, you can specify
the quantity using the pellet reserve menu as follows:
Press the MENU button for 2 seconds to view the SETTINGS.
Press + or – consecutively to view T. Max exit.
Confi rm by pressing MENU and the remaining quantity of
pellets will be displayed + that being loaded (default is 15 and
can be changed using the +/- keys).
Should the hopper run out of pellets, the boiler-fi replace will
block and 'Stop/Flame' will appear.
Variation feeding pellets (ONLY AFTER SUGGESTED
BY DEALER)
Press and hold the "M" key on the remote control for two se-
conds. Scroll through the display instructions using the "+"
and "–" keys, to the description "ADJ-PELLET". By con-
fi rming this function using the menu key you can adjust the
supply of pellets,
by reducing the set value, you decrease the supply of pellets,
increasing the set value increases the supply of pellets. This
function can be useful in the event that one changes the type
of pellets used, no longer using those for which the boiler-
fi replace was calibrated, thus necessitating an adjustment of the
load setting.
Should this correction not suffi ce, contact the Edilkamin-
authorised Dealer, to establish the new operating axis.
Notes on fl ame variability:
fl ame depend on the type of pellets used, as well as on normal
variation of solid fuel fl ames and on the periodic cleaning of
the crucible the boiler-fi replace automatically carries out
(Note: This does NOT replace the necessity cold vacuuming by
the user prior to start up).
-
Any changes in the state of the