Starting Up The String Inverter Using The E.key - Bosch BPT-S 3 Manuel De Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

English
Bosch Power Tec GmbH
Solar key or hand operated
6.3
Starting up the string inverter using
the e.Key
Prerequisites
Obtain an e.Key from the manufacturer: Pre-
programmed RFID card, which contains the
language, country and standard settings for the
respective location
Service switch is in position 1 and AC cabling is in
place
The e.Keys can be obtained in the Standard and
Premium variants. Both the standard card and the
premium card enable simplified commissioning.
Procedure
1. Hold the e.Key next to the specified point on the
inverter, depending on the device category
(approx. 3 seconds).
6.2:
Position of the e.Key on the device (single-phase:
BPT-S 3-4.6)
Bosch BPT-S 3 / 3.68 / 4 / 4.6 | Operating manual
Commissioning | 85

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bpt-s 4.6

Table des Matières