Krick Ro Marin Happy Hunter Notice De Montage Et De Mise En Œuvre page 42

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

315
Draught flap
316
Aerial holder
317
Door latch
318
Handrail
319
Split pin
Please note that you must make one right-hand and one
left-hand funnel.
- Glue the floors 306 and 307 to the funnel walls 305.
Note the markings for the exhaust pipes on the upper
floors.
- Glue these units in the funnel shells 308. Trim the
funnels, and sand the inside faces flat.
- Glue the funnel fairings 309 in place, angled as
shown.
- Make the exhaust pipes from the brass rings 310 and
311 and glue them together.
The superstructure, Figs. 160 - 166, Plan II
Part
Description
No.
320
Boat deck
321
Front panel
322
Front side wall
323
Transverse wall
324
Partition wall
325
Side wall
326-328 Aft wall
329
Brace
330
End wall
331
Companionway brace
332
Companionway support
333
Air shaft wall
334
Door
335
Angled wall
336
Bridge deck
"V"
Template
337
Bridge deck bulwark
338
Navigation lamp bracket base
339
Lamp bracket side panel
340
Lamp bracket back panel
341
Lamp bracket top panel
342
Handrail
343
Bulwark stanchion
344
Reinforcing strip
- Glue the walls 321 - 324 to the underside of the boat
deck 320.
- Glue the partition wall 324 in place, noting the 1.5 mm
spacing on both sides.
- Glue parts 325 - 335 in place as shown.
- If you are fitting auxiliary working systems, cut the
oval opening in part 336.
- Place the bridge deck 336 on the superstructure and
align it in such a way that it projects by the same
amount on both sides. Mark the centre. The bridge
deck must not rest on the wall 335; it should butt up
against its rear edge. The bridge deck bulwark 337 will
be glued on part 335 at a later stage.
18
ABS
Brass
Brass
Brass
Brass
Material
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
© Klaus Krick Modelltechnik, Germany, Stand 06.2017
1, laser-cut
1 Ø x 19
1 Ø
1 Ø
1 Ø x 15
- Glue the doors 314 to the funnels.
- Bevel the front face of the draught flaps 315 at the
top. These parts should be painted before they are
glued in place.
- Glue the aerial holder 316 to the left-hand funnel.
- Drill 1 mm Ø holes for the door latches 317 and the
handrails 318. Bend these parts to shape and insert
them. Fit the split pin 319 on the handrail for the right-
hand funnel.
- Apply the self-adhesive decals "a", "b", "p" and "r".
- The completed funnels should not be glued in place
until the superstructure has been completed.
Size in mm
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1, laser-cut
1,5 laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
2 x 2 x 290
1, laser-cut
3 x 3
- Glue the bridge deck in place using DELUXE Fusion
Acrylit or UHU Acrylit.
- Set the bulwark 337 central and glue it in place using
the template "V".
- Make up one right-hand and one left-hand navigation
lamp bracket from parts 338 - 341.
- Glue the lamp brackets in place.
- Trim the handrail 342 and the bulwark stanchions 343
to fit and glue them in place. Cut the eleven reinfor-
cing strips 344 to length and glue them to the inside of
the superstructure, referring to the detail view on Plan
II.
4
plate 7
1
8
As plan
6
As plan
1
No.
Notes
off
1
plate 4
1
plate 4
2
plate 5
1
plate 5
1
plate 4
2
plate 5
1 each
plate 5
1
plate 3
1
plate 3
1
plate 5
1
plate 3
2
plate 3
2
plate 7
1
plate 4
1
plate 5
1
plate 2
1
plate 4
2
plate 4
2
plate 4
2
plate 4
2
plate 4
1
5
plate 7
11
As plan

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1106

Table des Matières