Installation And Preliminary Operations - Nuova Simonelli APPIA V Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4.

INSTALLATION AND PRELIMINARY OPERATIONS

After unpacking, assess that the machine and
its accessories unit are complete, then proceed
as follows:
place the machine so that it is level on a flat
surface;
assemble its supporting feet by inserting the
insert into the cylindrical unit;
twist the rubber foot into the screw thread
inside the unit;
screw the whole assembled unit into the
allotted setting for the machine's adjustable
feet;
level the machine by regulating the adjust-
able feet;
NOTE: the unit grooves have to face upwards,
as shown in the following illustration.
It is advisable to install a softener (1) and then
a mesh filter (2) on the external part of the
plumbing system, during preliminaries and after
levelling the machine.
In this way impurities like sand, particles of
calcium, rust etc will not damage the delicate
graphite surfaces and durability will be guaran-
teed.
Following these operations, connect the plumb-
ing systems as illustrated in the following figure.
Recommended mains pressure for the
water is [2.3] bar.
Avoid throttling in the connecting tubes.
Assess that the drain pipe (3) is able to
eliminate waste.
1
KEY
Fig. 11
1 Softener
2 Mesh filter
3 Drain Ø 50 mm
NOTE: For a correct functioning of the machine
the water works pressure must not
exceed 4 bars.
Otherwise install a pressure reducer
upstream of the softener; the internal
diameter of water entrance tube must
not be less than 6mm (
The machine must always be protected by
an automatic omnipolar switch of suitable
WARNING
power with contact openings of equal dis-
tance or more than 3mm.
Nuova Simonelli is not liable for any dam-
age to people or objects due to not observ-
ing current security measures.
WARNING
Prior to connecting the machine to the electrical
mains, assess that the voltage shown on the
machine's data plate corresponds with that of
the mains.
2
NOTE: At the start of the day's activities and in
NOTE: In case of use where service is continu-
3
Fig. 12
3 8 "
).
CAUTION
RISK OF SHORT CIRCUITS
any case, if there are any pauses of
more than 8 hours, then it is necessary
to change 100% of the water in the cir-
cuits, using the relevant dispensers.
ous, make the above changes at least
once a week.
31

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Appia s

Table des Matières