Filling With Water; Water Draining Fig. 16; Bain-Marie Dry Counter - Tcpw; Set And Check The Temperature - Arneg Venezia 2 TCBM Manuel D'installation Et De Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 67
Venezia 2 TCBM-TCPW
English
5
Heating ceiling lamp
6
Anti-condensation ventilation
7
Filling/draining switch

16.3 Filling with water

Supply water pressure 300 kPa (3 bar)
- Set switch 7 to position I, the counter begins to fill with water.
When the water reaches the set level loading stops automatically.
The I position of the switch allows automatic water filling.

16.4 Water draining Fig. 16

Step
1
Set switch 7 to position O, filling stops
2
remove trays to access the "overflow pipe" - A -
3
remove the pipe - A -
4
wait for complete drainage
5
reassemble the tube - A -

16.5 Bain-marie dry counter - TCPW

1
Pos.
1
Main switch
2
Line
3
Basin thermostat
4
Heating signal light
5
Heating ceiling lamp
6
Anti-condensation ventilation

17. Set and check the temperature

- Turn the knob 3 and select the temperature to 90°C
Temperature control is performed via:
mechanical thermometer on the back near the control panel Fig. 11.
mechanical thermometer on the front stainless steel panel Fig. 12

18. Demisting system

The counter is equipped with fans Fig. 17 to prevent the formation of condensation on the front
glass.
i
Activate the fans only if condensation occurs.
38
2
3
Description
Heating lamp power on
Anti-condensation ventilation power on
Activation filling or draining of water
Action
4
5
Counter electric power supply
If on, indicates that the counter is in operation
Adjust the temperature of the basin
If on, indicates that heating is in operation
Heating lamp power on
Anti-condensation ventilation power on
6
Function
05060208 00 03-2021

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Venezia 2 tcpwSalzburg tcbmSalzburg tcpw

Table des Matières