The installation
• comply with the local standards in force
• have a floor able to support the weight of the counter
area should
• a switch with automatic protection against short circuits, ground discharges
• provide the space required for correct ventilation, use and maintenance
counter delivery • ensure the packing is intact and that it does not display readily apparent dam-
• carefully perform the unpacking operation in order not to damage the coun-
• check that counter components are intact
• should you notice any damage immediately inform the manufacturer
Installation pro-
cedure (Fig.3)
What to avoid
First cleaning
• gently remove the protective film, eliminate glue residues with suitable sol-
• carry out the first cleaning using neutral products, dry with a soft cloth
CAUTION! Discarded packing parts. Injury.
Do not leave packing parts (nails, wood, staples, etc.) and tools used for the operation (pliers,
scissors, etc.) in the working area.
These objects must be removed with appropriate means and taken to their respective col-
lection places.
i
For correct disposal, the package consists of:
wood - Polystyrene - Polythene - PVC - Cardboard.

14. Electrical connection

05060208 00 03-2021
and dispersions between the electric power line and the machine
age
ter
carefully examine the installation area, eliminating any danger to the
operator
remove the package only if the counter is placed in the operation area
Step
1
lift the counter safely
2
use suitable scissors to cut the clip tightening straps-A-
3
remove the clips and the frame
4
lower and place the counter in the area of use
7
adjust the horizontal position of the cabinet using a spirit level (Fig.8)
check that all feet are into contact with the floor
8
(Feet adjustment, H = 25 mm Fig.7)
9
level the counter both in front and back
Install maximum 3 counters within the same power supply and cooling
line
Should you need to move the counter, the latter must be levelled again.
Incorrect levelling
DO NOT install the counter (Fig.9):
- in areas at risk of explosion
- in open air and therefore subject to atmospheric agents
- near heat sources (direct sunlight, heating systems, incandescence lamps,
etc.)
- in the vicinity of air currents (close to doors, windows, air-conditioning sys-
tems, etc.) that exceed a speed of 0.2 m/s
vents
DO NOT use alcohol to clean the methacrylate (Plexiglas) parts
DO NOT use abrasives or metal sponges
Venezia 2 TCBM-TCPW
Action
English
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Venezia 2 tcpwSalzburg tcbmSalzburg tcpw

Table des Matières