Quickie SOPUR P-220 Manuel D'utilisation Et Garantie page 25

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

I X . S e t - u p , A d j u s t m e n t s a n d U s e
F. INSTALLATION OF AXLE TUBE ASSEMBLY
l. Align and slide the receivers on the axle tube assembly (A) with the guides (B) locat-
ed on the underside of the rear frame.
2. Rotate spring knobs (C) to disengage position.
3. Slide the axle tube assembly onto the guides.
4. Engage locking pins by rotating spring knob.
5. Ensure spring knob is in correct position and locking pin is engaged.
6. Ensure 24" (600 mm) manual wheels and anti-tip tubes are installed on the axle tube
assembly.
G. CHECK-OUT
Once the wheelchair is assembled and adjusted, it should roll smoothly and easily. All
accessories should also perform smoothly.
After the wheelchair has been set up, be sure the chair performs to your specified opera-
tional settings (see X. Operating Guide). If the chair does not perform to specifications,
turn the wheelchair OFF immediately and reprogram operational specifications.
Repeat this procedure until the wheelchair performs to specifications before attempt-
ing active use of the wheelchair.
If you have any problems, follow these procedures:
1. Review the set-up and check-out section and operating guide to make sure chair was
properly prepared.
2. If your problem persists, contact your authorised supplier. If you still have a problem
after contacting your authorised supplier, contact Sunrise Medical customer service.
See the introduction page for details on how to contact your authorised supplier or
Sunrise customer service.
All manuals and user guides at all-guides.com
E n g l i s h
B
A
C
25
930479 Rev. C

Publicité

Table des Matières
loading

Table des Matières