Télécharger Imprimer la page

Chloride Power Protection Linear Plus Manuel D'utilisation page 54

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73
Operating the Device
Wait for at least 30 seconds until the output voltage has stabilized
(yellow LED illuminated) then switch Output Switch to position (I) ON.
Close any external switches connecting the load (if present).
Press the button
second to switch on the inverter (see "Panel Linear Plus RM" on page
EN-43).
In addition to the "LINE" and "BYPASS" LEDs the "LOAD" LED is now
illuminated. After a few seconds the "INVERTER" LED is illuminated and the
"BYPASS" LED is extinguished. The UPS is now in ON-LINE operation.
UPS shutdown procedure - Linear Plus RM
Note
Carrying out this procedure will interrupt the supply to the load.
Press the button
second to switch off the inverter.
Open any external switches connecting the load (if present).
Switch Input Switch to position (0) OFF.
To disconnect battery DC voltage please unplug the battery cable(s)
on the rearside.
Ensure all switches and circuit breakers upstream of the UPS are
open.
Ensure that all LEDs on the control panel are extinguished. The
UPS is now completely shutdown.
Functional test
Note
Supply to the load is not guaranteed during this test, it should not be
carried out if a critical load is connected to the UPS.
EN-52
on the UPS control panel for a minimum of 1
on the UPS control panel for a minimum of 1
User Handbook
CHLORIDE LINEAR Plus/RM
SU59802UM01, rev.3/ Last modified: 08/2005

Publicité

loading

Ce manuel est également adapté pour:

Linear plus rm