Télécharger Imprimer la page

Chloride Power Protection Linear Plus Manuel D'utilisation page 25

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73
CHLORIDE LINEAR Plus/RM
External electrical connections
In order to gain access to the external electrical connections it is necessary
to remove the rear protection panel of the UPS. Once the cables have been
connected they shall be passed through the cable clamps which will hold
them in position. Connect the earth cable first.
Danger
Ensure that the UPS is isolated before removing panels.
Fig. 8: Side view Linear Plus, 6 and 10kVA
Note
Once installation has been completed, the vertically sliding feet fitted on
the UPS must be used to fix it in position.
Connecting mains and load
Connect the mains supply to the input terminals of the UPS (Linear Plus 6
kVA see Fig. 10 on page EN-24 and for 10 kVA see Fig. 11 on page EN-25).
If Linear Plus 10kVA is supplied by 1-phase mains connect the Live phase
to input L1. If it is supplied by 3-phase mains connect the phases to
L1,L2,L3 to input terminals. UPS Linear Plus 10kVA is equipped with
autosensing, which detects whether a 1 or 3 phase supply is connected to
the UPS.
Connecting parallel UPS configurations: refer to chapter "Paralleling UPS
Devices" on page EN-55.
User Handbook SU59802UM01, rev.3/ Last modified: 08/2005
REAR PANEL
CABLE ENTRY
Remove L -shaped
metal sheet
Installation
E
N
EN-23

Publicité

loading

Ce manuel est également adapté pour:

Linear plus rm