Xylem Goulds S10020 Manuel D'instructions page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FIBERGLASS BASIN INSTALLATION REFERENCE GUIDE
CAUTION:
HANDLE WITH CARE
DO NOT DROP
DO NOT IMPACT
DO NOT ROLL
DO NOT WRAP
CABLE OR CHAIN
AROUND BASIN
COMPACTED SUB-BASE MINIMUM
12" OR 6" WHEN USED WITH CONCRETE
HOLD-DOWN PAD
ADJACENT STRUCTURE, FOUNDATION,
FOOTING OR PROPERTY LINE
5'-0"
MINIMUM
IN THE ABSENCE OF BUILDING CODES, OR
REGULATIONS, MAINTAIN A MINIMUM DISTANCE OF
FIVE FEET PLUS A SLOPE OF 45" FROM THE BOTTOM
OF THE COMPACTED SUB-BASE TO, THE BOTTOM OF
THE ADJACENT STRUCTURE'S FOUNDATION, FOOTING
OR PROPERTY LINE.
PEA GRAVEL
BACKFILL MATERIAL REQUIREMENTS
14
30° MAXIMUM
45º
MINIMUM
NOTE:
The intent of these installation instructions and illustrations is to ensure that damage or premature
failure to the basin will not occur. These installation instructions and illustrations are NOT intended
to preclude normal safety procedures which should be followed to prevent injury to personnel.
SAFE INSTALLATION PROCEDURES SHALL BE ENTIRELY THE RESPONSIBILITY OF THE
INSTALLER.
CRUSHED ROCK
LIFTING CABLE OR CHAIN
SPREADER BAR
FINISH GRADE
OPTIONAL LIFTING LUGS
SLOPE AND SIZE OF EXCAVATION AS PER
OSHA AND ENGINEER'S SPECIFICATION.
IN THE ABSENCE OF THESE, CONSIDER
CONDITION OF SOIL, DEPTH OF EXCAVATION
AND SAFETY CONSIDERATIONS.
BASIN ANTI-FLOATATION FLANGE
COMPACTED SUB-BASE AND/OR CONCRETE
SLAB AS PER ENGINEER'S SPECIFICATION
12" MINIMUM BACKFILL COMPACTED TO A MINIMUM
SOIL MODULUS OF 700 LBS. PER SQUARE FOOT
FINISH GRADE
FIBERGLASS BASIN AS
REQUIRED PER ENGINEER'S
SPECIFICATION
BACKFILL MATERIAL
CONCRETE GROUT AS
REQUIRED PER ENGINEER'S
SPECIFICATION

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Goulds d10020

Table des Matières