battioni Pagani GARDA EVO Serie Notice D'emploi Et D'entretien page 124

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

instruction manual
for use and maintenance of the combined groups for the GARDA EVO series
Bombas Comet/HPP-serie EL
INSTALLATION
The Garda Evo group must be installed rigidly on a planar frame (sized to prevent vibrations and buckling) with a MAX
tilt of 3°. Ensure sufficient space for the circulation of cooling air and to reach the lubrication points (oil levels, grease
nipples, etc.). Leave room to manoeuvre the selection levers. Secure to the frame before the most rigid part (Garda Evo
box).
INSTALLATION HIGH PRESSURE PUMP
The high pressure pump is connected to the gearbox with a support (see Figure above) and the two shafts are connected
by a coupling connection (as shown in Figure 5). The high pressure pump must be secured to the frame according
to the instructions listed in the annexed "Instructions manual" annex. Also for the hydraulic connections, consult the
instructions manual attached.
Junta 4179-5020707024
page 106
40
Figure 5 Flexible coupling connection
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Garda evo dGarda evo pGarda evo h

Table des Matières