Preparing For Installation; Parts Provided - Signature Kitchen Suite SKSDR360GS Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

16 INSTALLATION

Preparing for Installation

Tools Needed
Phillips screwdriver
Level
Pipe wrench (2)
(one for support)

Parts Provided

Template (1)
Anchor sleeves (6)
Materials You May Need
• Gas line shut-off valve
• Pipe joint sealant that resists action of natural and LP gases
• Flexible metal appliance connector (
Never use an old connector when installing a new range.
• Flare union adapter for connection to gas supply line (
• Flare union adapter for connection to pressure regulator on range (
• Liquid leak detector or soapy water
• Lag bolt or
/
" O.D. sleeve anchor (for concrete floors only)
1
2
Flat-blade screwdriver
1
/
Open-end or
adjustable wrench
Tape measure
Anti-tip bracket kit (1)
Lag bolts (6)
/
" or
/
" NPT x
3
1
4
2
" Nut driver
Pliers
4
Drill
Safety glasses
Gloves
Front rail (1)
Leg cover (2 sets)
/
" I.D.)
1
2
/
" or
/
" NPT x
/
" I.D.)
3
1
1
4
2
2
/
" NPT x
/
" I.D.)
1
1
2
2
Dolly
Screws (8)
(Leg cover, Front rail)

Publicité

Chapitres

Table des Matières
loading

Table des Matières