Télécharger Imprimer la page

RHOSS TCAEBY 269 Mode D'emploi page 61

Publicité

Les langues disponibles
  • FR

Les langues disponibles

TCAEBY 269÷2112
TCAETY-THAETY 269÷296
TCAESY-THAESY 269÷296
L4
L1
L2
L3
L4
TCAETY-THAETY 2112÷2146
TCAESY-THAESY 2112÷2146
TCAEQY-THAEQY 2112÷2146
L4
L1
L2
L3
L4
TCAEQY-THAEQY 269÷296
L4
L1
L2
L3
L4
N.B.:
L2 is the minimum distance to remove the pump unit and the relative
tank or tube and shell. If the accessory is not present, the distance can
be reduced. The space above the unit must be free from obstacles.
are still valid, provided that at least two adjacent walls are not higher
than the unit itself.The minimum gap between the top of the unit and
any obstacle above it is 3,5 m. In case multiple units are installed, the
minimum space between finned coils must not be less than 2m.However
installed, the coil inlet air temperature (environment air) must remain
within the imposed limits.
Section II :: Installation and maintenance
L1
L2
L3
mm
1500
mm
2000
mm
1500
mm
1000
L1
L2
L3
mm
2000
mm
2000
mm
2000
mm
1500
L1
L2
L3
mm
1500
mm
2000
mm
1500
mm
1000
IMPORTANT!
Incorrect positioning or installation of the unit may amplify noise levels and
vibrations generated during operation.
The following accessories are available to reduce noise and vibration:
SAM - Anti-vibration mountings.
When installing the unit, bear the following in mind:
sound pressure level reading near the appliance by as much as 3
dB(A) for every surface;
install suitable anti-vibration mountings under the unit to avoid
transmitting vibrations to the building structure;
supported by solid structures.
If the pipes are routed through walls or panels, insulate with elastic
sleeves. If, after installation and start-up of the unit, structural vibrations
are observed in the building which provoke such strong resonance that
acoustic technician for a complete analysis of the problem.
61
EN

Publicité

loading