Initial Commissioning; Unpacking; Assembly; Cover Removal - Bosch TCE 4335 Notice Originale

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 40
en
26 | TCE 4335 | Initial commissioning
Pos.
Name
18
Compressed tank
19
Inflation gauge
20
Inflation pipe
21
Deflation button
22
Lubricator holder bulb
23
Bead lifting lever
4.

Initial commissioning

4.1

Unpacking

1. Remove the tape and the fixing clamps from the
pallet and the packaging cardboard.
i
After unpacking check the integrity of TCE 4335 and
check that no components are visibly damaged. In
case of doubt do not proceed to start-up and con-
tact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2

Assembly

4.2.1

Cover removal

1. Unscrew the 4 screws of the side cover and remove
the cover itself.
|
1 695 106 642
2010-12-22
Function
Inflates tubeless tires. Inflation is achieved through high pressure blowing that positions
the tire bead on the rim edge.
The air tank (compliant to UE 87/404) has a capacity of 18 litres of compressed air.
Tire inflation check.
The manometer is compliant to CEE 87/217 directive.
Tire inflation.
Tire defl ation.
Mounting paste containing support.
Lifting of the tire edge in demounting and mounting phases.
4.2.2

Lifting of the tilting column

1. Unscrew the fulcrum-pin screw of the column with
the hex key 6 and remove the pin.
2. Get a 1 Mt lifting sling, DR 50 model (safety factor
6:1); wrap the sling around the tilting column and lift
the column with a hoist.
3. Lean the column on the casing.
Robert Bosch GmbH

Publicité

Table des Matières
loading

Table des Matières