Maintenance work

15.1 Authorized maintenance personnel

Risk of falling! Danger of being injured by falling objects!
Danger of death due to incorrectly carried out maintenance or
service work!
Maintenance and service work which require the hoist to be
opened may only be performed by the following authorized
parties:
Greifzug Hebezeugbau GmbH
Hoisting gear workshops authorized by Greifzug He-
bezeugbau GmbH
Service personnel trained and certified by Greifzug He-
bezeugbau GmbH

15.2 Mandatory inspections

A written certificate is required for the annual inspection and any
exceptional tests. The inspections must be recorded in the log-
book included with delivery.
Prior to every use
The correct working state of the hoist and the accessories must
always be checked before each use, see ' 9.4 Commissioning' on
page 12.
Annual safety test
The safety inspection must be carried out annually.
Only authorized maintenance personnel are permitted to carry
out the safety inspection, see ' 15.1 Authorized maintenance per-
sonnel' on page 16. An intermediate inspection might also be
necessary, but this depends on the usage conditions (e.g. opera-
tion in an extremely dirty environment).
General overhaul
The general overhaul periods are:
500 running hours for devices with 6 or 9 m/min rope
speeds.
A general overhaul of the hoist must only to be undertaken by
Greifzug Hebezeugbau GmbH or a hoisting gear workshop that
has been approved by Greifzug Hebezeugbau GmbH.
We recommend that the system is tested in our factory by
Greifzug Hebezeugbau GmbH.
Contact Greifzug Hebezeugbau GmbH or your supplier with re-
gards to this test.
EN–16
DANGER!

15.3 Care and maintenance

Interval
Work
Daily
– Check the anchorage
of the hoist
– Inspect the rope for
clinging dirt
– Check the oil level on
the maintenance unit
Weekly
– Inspect the rope
– Check the com-
pressed air hoses
Every 50 operat-
– Lubricate the traction
ing hours or as
sheave external teeth
necessary
(only model series XA
2050 P)
1 x annually
– Safety inspection for
the hoist
– General overhaul of
1)
500
operating
the hoist
hours
Whenever neces-
– Clean the rope
sary
– Lubricate the rope
– Replace the rope
– Replace the com-
pressed air hoses
– Clean the filter on the
maintenance unit
– Drain the water from
the water separator
Devices with 6 or 9 m/min rope speed
1)
Rope
Risk of injury through stabs and cuts!
Broken wires can result in protruding wires! Protruding wires
can cut or pierce protective gloves!
Wear suitable leather protective gloves when working
with ropes.
Never let the rope run through your hands!
Cleaning
Brush off soiled ropes when dry if necessary. Lubricate again if
necessary.
Use the brush attachments to clean the rope on the hoist in an
extremely dirty environment.
Execution
Operating personnel
Operating personnel, see
page 16
Operating personnel, see
page 18
Authorized maintenance
personnel, see page 16
Greifzug Hebezeugbau
GmbH or a hoisting gear
workshop that has been
approved by Greifzug
Hebezeugbau GmbH
Person appointed and
trained by the operator,
see page 16
Trained person ap-
pointed by the operator.
DANGER!
Rev. 08/2010