Fortress Building Products PURE VIEW Instructions D'installation page 9

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 2
B
C
B
Step 2:
Pre-Drill and Install Brackets
Tip:
• It's important to double check dimensions to confirm ac-
curacy of bracket hole locations before drilling.
1. Use Spring Punch to mark the holes. As shown in Fig. 1.
2. Pre-drill bracket holes with a 3/16" [89.5mm] drill bit. As
shown in Fig. 2.
3. Attach Bracket to the posts with supplied T-25 thread-cut-
ting screws. Use two screws per bracket. Use low speed
setting on drill. As shown in Fig. 3.
4. Once top and bottom brackets are installed, remeasure
bracket spacing to confirm dimensions used in Fig. 2 and 3
of step 1. As shown in Fig. 4.
5. Remove all metal shavings from deck, post base cover,
post, and panel before bracket is screwed to post to
prevent corrosion.
Fig. 1
PURE VIEW: Al
B
A
D
HOME GLASS BALUSTER INSTALLATION
13
A
Fig. 2
9

Publicité

Table des Matières
loading

Table des Matières