Fortress Building Products PURE VIEW Instructions D'installation page 41

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STAIR BRACKET: BALUSTER INSTALLATION
Step 1:
Install Adjustable I-Support On Bottom Rail
1. Measure and locate the center of the bottom rail. Using the
I-Support as a guide, mark the center of the 2 screw holes.
As shown in Fig. 1.
2. Using a 3/16" [4.5mm] drill bit, drill though the outside wall.
3. Install the I-Support with the provided Phillips Head Thread
Cutting Screws. As shown in Fig. 2.
Note:
• Be sure to install I-Support on side of rail facing deck.
Fig. 1
Step 2:
Install Bottom Rail
1. Install cut bottom rail into the lower installed brackets.
2. Pre-drill Bracket Cup holes for screws using a 3/16"
[89.5mm] drill bit.
3. Secure rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
As shown in Fig. 2.
Note:
• Only one screw is needed to attached each bracket to the
rail.
PURE VIEW: Al
Fig. 2
3/16"
[4.5mm]
Hole
HOME GLASS BALUSTER INSTALLATION
13
Phillips
Head
Thread
Cutting
Screws
41

Publicité

Table des Matières
loading

Table des Matières