Fortress Building Products PURE VIEW Instructions D'installation page 8

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 5:
Check Mounted Posts
1. Shim post as needed to ensure post is level.
Fig. 1
BRACKET INSTALLATION
Step 1:
Mark Bracket Hole Locations
1. Mark the centerline of each post with a pencil.
2. Take measurements used in Fig. 1 and 2 to mark bottom
and top bracket hole locations onto posts.
Fig. 1
Pre-drill Dimensions: Pre-drilling with a 3/16"[4.5mm] drill bit is required
A*
(1)
32-1/2" [826mm] Panel
-
3
13/16" [97mm]
(2)
40" [1016mm] Panel
2-1/2" [63.5mm]
*Dimension A positions bottom edge of rail (1) 3-1/2" [89mm] and (2) 2" [51mm]
above deck surface.
*Dimension A is measured from the bottom surface of post base.
8
Fig. 2
Wood Block
Joist / Blocking
Bracket Hole Locations
B
3/8" [9.5mm]
3/8" [9.5mm]
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13
Shim post as needed to
ensure post is level
Deck Board
1/2"
[12.5
]
mm
C
35-1/16" [890.5mm]
41-3/16" [ 1047mm]
D
3/4" [19mm]
3/4" [19mm]

Publicité

Table des Matières
loading

Table des Matières